Keyphrases
Axial Capacity
8%
Cable Burial
15%
Centrifuge Modelling
28%
Centrifuge Test
10%
Cone Penetration Test
6%
Cyclic Performance
6%
Cyclic Response
9%
Dense Sand
7%
Design Optimization
16%
Discrete Element Method
20%
Displacement Accumulation
7%
Drag Embedment Anchor
9%
Floating Offshore Wind
9%
Floating Wind
14%
Fluke
14%
Helix
13%
Helix pitch
6%
Installation Depth
6%
Installation Effects
6%
Installation Process
6%
Installation Torque
7%
Large-diameter pile
6%
Lateral Capacity
10%
Lateral Load
8%
Long pile
6%
Material Point
9%
Medium Dense Sand
9%
Offshore Environment
6%
Offshore Jacket Structure
6%
Offshore Renewables
15%
Penetration Behavior
17%
Penetration Depth
7%
Physical Modeling
10%
Pile Design
11%
Pile Geometry
14%
Pile Installation
13%
Push-in
9%
Renewable Energy Consumption
13%
Rigid Body
6%
Risk Assessment
11%
Sand
35%
Scale Model Test
6%
Screw Anchors
15%
Screw pile
100%
Single Helix
18%
Soil Type
8%
Tensile Strain Capacity
10%
Underwater Noise
8%
Uplift Capacity
21%
Wind Applications
11%
Engineering
Axial Capacity
8%
Beneficial Effect
6%
Centrifuge
46%
Centrifuge Testing
13%
Compressed Air Motors
15%
Cone Penetration Test
9%
Cyclic Loading
15%
Deep Water
6%
Dense Sand
22%
Design Optimization
12%
Detrimental Effect
7%
Digital Elevation Model
13%
Discrete Element
30%
Driven Pile
11%
Element Method
30%
Embedment
17%
Energy Application
21%
Failure Mechanism
8%
Finite Element Analysis
8%
Floating Offshore Wind Turbine
7%
Installation Process
12%
Installation Requirement
41%
Jacket Structure
10%
Large Deformation
9%
Lateral Loads
9%
Loose Sand
6%
Material Point
9%
Material Point Method
5%
Model Scale
7%
Numerical Modeling
7%
Offshore Renewable Energy
19%
Offshore Wind Turbines
9%
Optimised Design
9%
Parametric Study
7%
Penetration Depth
17%
Physical Modeling
14%
Pile Design
14%
Pile Foundations
7%
Pile Installation
16%
Power Cable
9%
Power Converter
8%
Reaction Force
6%
Renewable Energy
7%
Rigid Structure
9%
Scale Model
9%
Subsurface
9%
Tensiles
31%
Wave Energy
8%
Wind Power
9%