Pushed-in piles, a silent piling method for offshore wind turbine foundations.

    Research output: Contribution to conference › Paper › peer-review

    40 Downloads (Pure)

    Abstract

    The rapid expansion of offshore wind energy demands quieter, more sustainable foundation installation methods. Traditional pile may generate harmful underwater noise, prompting the need for alternatives. This study investigates the feasibility of a “pushed-in” pile installation technique using a cluster of four hydraulically jacked piles, offering a silent solution for offshore wind turbine foundations. Centrifuge testing was conducted to assess the influence of installation sequence, pile diameter, and spacing on method efficiency. Results show that the pushed-in method enables pile embedment depths up to four times greater than those achieved under static weight alone, with reaction forces nearly double the tool weight due to mobilised tensile resistance. Efficiency improves with smaller pile diameters and wider spacing, while control strategies that minimise reaction pile displacement and optimise force distribution significantly enhance performance. Among three control methods tested, the third – featuring a final force equalisation – yielded the highest efficiency and depth. These findings inform the design of full-scale installation tools and suggest that clusters of smaller piles may offer superior performance. These results can inform future work such as the development of a predictive method base on CPT data to predict refusal and resistance of the cluster.
    Original languageEnglish
    Pages3339-3344
    Number of pages6
    DOIs
    Publication statusPublished - 14 Jun 2026
    Event21st ICSMGE Conference - Austria, Vienna, Austria
    Duration: 14 Jun 2026 → 19 Jun 2026
    https://www.icsmge2026.org/en/

    Conference

    Conference21st ICSMGE Conference
    Abbreviated titleICSMGE 21
    Country/TerritoryAustria
    CityVienna
    Period14/06/26 → 19/06/26
    Internet address

    UN SDGs

    This output contributes to the following UN Sustainable Development Goals (SDGs)

    1. SDG 7 - Affordable and Clean Energy
      SDG 7 Affordable and Clean Energy
    2. SDG 9 - Industry, Innovation, and Infrastructure
      SDG 9 Industry, Innovation, and Infrastructure

    Keywords

    • Silent piling
    • offshore wind
    • push in piles
    • sand
    • Pile groups
    • pile installation

    ASJC Scopus subject areas

    • Renewable Energy, Sustainability and the Environment
    • Geotechnical Engineering and Engineering Geology
    • Civil and Structural Engineering

    Fingerprint

    Dive into the research topics of 'Pushed-in piles, a silent piling method for offshore wind turbine foundations.'. Together they form a unique fingerprint.

    Cite this